Skip to main content
Before
After

Cleaning Trial Summary

Segment
:: TSR #18-A-125

 

Customer Objective

Improve cleaning performance, reduce rework and reject rate, recover scrap parts

Cleaning Trial Type
Temperature
Aqueous
Temperature
150°F
Industry
Time Required
Industry
Train Development
Time Required
30 minutes to 2 hour
Segment
Substrate
Taxi, Bus
Aluminum
Soil
Metal chips from machining Oil, Shop Dirt
Description of Part(s)
Description of Part
Assorted manifolds for train hydraulic breaking units
Cleaner Used
Machine Used
Machine Used

Spray Under Immersion Washer (Graymills T12, Graymills T24, SK Model 81.8 w/ SUI)

Post Cleaning
Post Cleaning

Fresh water rinse and air pressure dried (several areas with adhesive tape/adhesive stickers were brushed with a soft nylon bristle brush during the fresh water rinse)

Recommendation to Customer
Recommendation

The ArmaKleen Technical Center recommends using a 5% by volume solution of ArmaKleen™ Bio 24 at 150°F in a Spray-Under Immersion Washer for a minimum of 30 minutes to 2 hours