Before Picture
Before
After Picture
After

Cleaning Trial Summary

 

The customer was looking to improve their cleaning performance, automate their cleaning process and reduce rework and reject rate.

Cleaning Trial Type
Temperature
Aqueous
160°F
Industry
Time Required
Mold manufacturing
15 to 30 minutes
Segment
Substrate
Machine Manufacturing
Aluminum
Soil
Aluminum dust, Cutting Fluids, Silicone
Description of Part(s)
Mold/plate, plates, connector roller, brace
Cleaner Used
Machine Used

Spray Washer (JRI TL3, JRI FL250, JRI FL500, Better Engineering G-2000)

Post Cleaning

Fresh water rinse followed by air pressure drying.

Recommendation to Customer

The ArmaKleen Technical Center recommended using 5% by volume ArmaKleen™ 4 in 1 Cleaner at 160°F in a Spray Washer for a minimum of 15 – 30 minutes.